Architects: JSWD
Lead Architects: Konstantin Jaspert and Mario Pirwitz
Design Team: Christian Mammel, Florian Husemeyer and Matteo Giovanelli-Dürfeld
Landscape Architects: RMP Stephan Lenzen
General Contractor: AUG. PRIEN Bauunternehmung
Client: Art-Invest Real Estate Management GmbH & Co. KG
Photographers: Christa Lachenmaier, HG Esch
The property is located at the intersection of a busy highway and a wide railroad track. This is where the southern part of the city center, the former government district, and the “museum mile” meet. The newly constructed building complements the existing ensemble of high-rise buildings designed by Helmut Jahn and Egon Eiermann. The consistent facade structure allows the three buildings to form a single visual entity.
A slender vertical tower rises out of one of the buildings, appearing to float over a glass foyer. With 28 stories and more than 100 vertical meters, the high-rise anchors the office complex within the city skyline.
The project removes the “barrier” created by the previous building—the long-vacant 18-story Bonn Center. For almost 50 years, this high-rise dominated the cityscape, blocking paths and views.
With their irregular layout, the three new buildings nestle into the corners of the triangular plot. This creates an outdoor public space in the middle that people can freely walk through, thereby establishing a connection to the neighboring residential area. The new city square opens up towards the Rhine River and the UN district, and the prestigious addresses of the office buildings and their equally impressive driveways are also located here.
Danish artist Jeppe Hein created an open, spiral-shaped installation entitled "Mirror Pavilion” specifically for the center of the site.
With its flexible and versatile working environments, the campus offers space for interdisciplinary communication and encounters, while restaurants and cafés provide added value to both the office workers and the residents of the surrounding neighborhood.
In Buildings 2 and 3 (5 to 7 stories), the white facade grid is comprised of load-bearing precast concrete elements. This allows the depth of the elements to be utilized constructively, while ensuring the offices are kept free of columns or supports projecting into the interior.
In the high-rise, a load-bearing reinforced concrete skeleton is integrated into the glass surface. The geometry of the external facade structure was created with the help of insulated facing panels of fiberglass-reinforced concrete.
The concrete facade only extends behind the glass fronts in the foyers of the three buildings. The facade concept also continues in the interior: the cladding on the ceiling and rear wall is also made up of triangular fiberglass-reinforced concrete elements.
In the three-story foyer of the high-rise, these elements are up to 11 meters long. Here, four slender hinged supports bear the load of the upper stories that project up over the foyer, thereby seeming to float above it.
The facade grid is made of cream-white, acidified architectural concrete with a double-layer hydrophobic coating. Its design connects all three buildings to create a harmonious ensemble while at the same time minimizing the use of formal means. In the high-rise – as opposed to the other two buildings – the facade panels extend over two stories; around the base of the high-rise, they actually span three. This feature emphasizes the building’s vertical height.
As the viewer moves and therefore changes their perspective, the geometry of the facade structure continues to shift – at times appearing more compact, at times more open. By reconciling the different concrete formulations, it was possible to create an identical surface appearance despite the different construction methods and the fact that the load-bearing facade supports and non-load-bearing facing panels were constructed at different times.
Numerous sustainability aspects were considered during the project’s planning phase: green roofs, photovoltaic, district heating and concrete core tempering, LED lighting, water-saving fixtures and a ventilation system with waste heat recovery. The use of renewable and locally sourced raw materials was also taken into consideration. All buildings are certified LEED Gold, and final certification is already underway.