International Architecture Awards Tell a friend
Architects: Archer Office
Design Team: Tomek Archer, Carmen Blanco, Christine Lee, Josh Wrathall, Luke Pigliacampo, and Asier Celaya
Landscape Architects: ASPECT Studios
General Contractor: Schiavello Construction Pty Ltd.
Client: Waverley Council
Photographers: Hamish McIntosh and Peter Bennetts
A new civic precinct has been formed by linking the Heritage-listed Boot Factory to the Mill Hill Centre, with upgrades to Norman Lee Place and a covered terrace on the top floor, allowing the functions within both buildings to engage with the Bondi Junction context.
The Boot Factory has been adaptively reused to create a Community and Innovation Hub. While it seems counterintuitive to place a hub for innovation within a Heritage building, the scheme prioritises the creation of a series of flexible rooms, enhancing the qualities of the original building with natural light and ventilation. Rather than introduce soon-to-be-redundant technologies, the design references the architecture of the Enlightenment to connect to the natural environment with a long-term view.
The project consolidates council functions, including offices for staff alongside community programs and open space, to create a civic heart for the ‘Neighbourhood Centre’ planning zone of Bondi Junction.
By linking the Boot Factory and Norman Lee Place directly to each level of the hard-working Mill Hill Centre, interrelationships are enhanced between Council administration and programs.
The scheme reinstates the Boot Factory within the public realm, drawing visitors into the site with a large light-based artwork on the rear wall behind the Boot Factory, providing an active backdrop and outlook to the Boot Factory that is visible from the street. The Boot Factory has been opened to the ground on all sides.
Linking the buildings allows sharing of amenities, services, storage and lift access, liberating the Boot Factory from these functions. The ground floor ‘Packing Room’ provides a hard-wearing space connected to the ground plane, while the middle level is subdivided with movable partitions to form adaptable ‘Workshop Spaces’. An open stair rises to the ‘Cloud Room’, with a vaulted timber roof providing a generous volume topped by a large skylight.
The Boot Factory interior and roof were completely reconstructed, with only the brick perimeter walls retained. Concrete-engaged columns were installed with a ring beam to hold the bowing brick walls in place in preparation for a new glue-laminated Australian hardwood structure. Solid hardwood floor slabs resist fire, with a floating floor concealing services, allowing for their replacement over time. External screens resist fire while allowing windows to be opened.
By prioritising retention and prefabrication, the project minimises waste and construction costs while maximising longevity. Durable materials reduce ongoing maintenance, while efficient environmental systems significantly lower operational costs.
Sustainability is at the core of the project, from the reuse of heritage brick walls to the prefabricated timber structure that reduces embodied carbon. Geothermal heating and cooling, passive ventilation, and a solar array minimise energy consumption. Recycled timber from the original structure is repurposed for new entry doors, symbolising both environmental and cultural sustainability.
The successful adaptive reuse of the Boot Factory lies in its integration within a consolidated precinct, located within an expanded public domain and connected with the adjacent Mill Hill Centre.