International Architecture Awards Tell a friend
Architects: Beijing Institute of Architectural Design (BIAD)
Lead Architects: Xu Quansheng, Du Song, Wu Jianli, Zhang Fan, Wang Wei, and Ma Cangyue
General Contractor: BCEG No.3 Construction Engineering Co., Ltd.
Client: Sinobo Gongti (Beijing) Business Operation & Management Co., Ltd.
Photographs: Courtesy of the Architects
The construction of the project has a total area of 385,000 square meters. The transformation of Beijing Workers' Stadium is based on the design concept of a professional football stadium and sports complex built based on the construction technology system to realize the organic combination and renewal of traditional buildings, modern venues, and the sports industry. The reconstruction follows the principle of 'traditional appearance and modern venues', retains the classic shape, façade form, and characteristic elements of the original workers' stadium, integrates the functional elements of the site, and forms a new highlight of the reconstructed stadium.
The reconstructed Workers' Stadium will become an open urban sports park with a professional football field as the core. The new Workers' Stadium adopts digital construction, digital disclosure, digital management, and other key technologies. In order to restore the original architectural style, the new stadium is constructed with fair-faced concrete techniques on the basis of retaining the original color. After completion, it will become the single building with the largest-scale application of fair-faced concrete construction technology in China. Compared with ordinary concrete, fair-faced concrete can greatly reduce construction waste by eliminating the process of secondary exterior eaves decoration and secondary interior decoration. At the same time, fair-faced concrete can also resist oxidation, corrosion, wear, and tear without falling off after coating the protective layer on the surface, so that the façade of the new Workers' Stadium does not need to be overhauled during the life cycle of the building. At the same time, its minimalist style also reminds people of the style of the old Workers' Stadium.
The new Workers' Stadium adopts the principle of maximizing the opening area of the canopy and utilizes a polycarbonate plate with a high transmittance rate (70%-90%). The polycarbonate plate adopts the light wavelength control UV technology, which can make the visible light beneficial to the growth of grass on the site and shield the unfavorable light wavelength. The design also minimizes the energy consumption of the professional football turf for light supplementing. The new Workers' Stadium is not designed by traditional methods but by means of overall digital twin design, digital simulation, digital generation, digital shape fitting, digital acoustic design, and other approaches.
3D simulation technology is applied to human flow design, to realize commercial regulation, as well as the storage and dissipation of human flow. Digital simulation is adopted to simulate the spatial circulation, to optimize the unique human flow distribution mode of the Workers' Stadium. The shape of the newly added canopy is not a subjective design, but is generated by CFD fluid dynamics simulation and is repeatedly optimized. The new canopy can cover all the audience seats, and improve the venue's ability to hold games in extreme weather and the audience's game-watching experience. The canopy adopts a parametric digital collaborative design and integrates the functions of shading, lighting, water drainage, snow melting, photovoltaic power generation, sound absorption, and noise reduction. The municipal facilities around the Workers' Stadium are relatively old. The reconstructed Workers' Stadium is designed in a way that helps alleviate the burden of the surrounding municipal facilities. The project innovates the key technologies for rainwater, reclaimed water, and ecological reuse. Besides, it resorts to ecological technology to solve the problems of lawn and greenery irrigation at the new Workers' Stadium, and to improve the urban drainage environment in the surroundings.
The new Workers' Stadium is in line with the design concept of world-class professional football fields, using the anchor grass system that has become the mainstream in the European top league. The anchoring grass system is a combination of natural grass and artificial fibers to ensure that the stadium reaches a higher standard. After transformation, the Workers' Stadium will become a professional football field and sports complex covered by an urban green park. While restoring the open and comfortable space layout, the reconstruction will greatly save land resources and restore green spaces. After the renovation, 69% of the building area, which is dynamic space, is located underground. In the form of TOD+ block+ Mall, a number of themed commercial spaces are created to gather brand flagship stores, first stores, new retail, events, performances, and other content. The underground space of the reconstructed Workers' Stadium is treated in a way that lets the audience get a natural and comfortable outdoor space feeling. In the future, Metro Line 3 and Line 17 will be connected with the Workers' Stadium, with a station set at its northeast corner. From the subway entrance, passengers can directly enter the Workers' Stadium area and the underground supporting businesses. In the future, after the end of the competition, the congestion of people can be alleviated and diverted through parks and commercial areas. The B2 floor, as the lawn floor of the professional football field, diverts the audience from the ground up and down, greatly reducing the energy consumption of the vertical traffic.
A new low-carbon flow organization model is created for the new Workers' Stadium. The photovoltaic power generation area will be set around the canopy of the new Workers' Stadium, and the photovoltaic power generation system will provide part of the power for daily operation in areas such as the football field and the underground supporting garage. Various measures such as building integrated photovoltaic can be estimated to save about 300 tonnes of standard coal each year.