Sky Pool | London, United Kingdom | 2021

Architects: HAL Architects
Structural Engineers: Eckersley O'Callaghan Engineers
General Contractor: Reynolds Polymer Technology Inc.
Client: Ecoworld Ballymore
Photographers: Simon Kennedy 

Skypool is an elegant transparent acrylic structure that links two residential buildings in London's new Embassy Gardens district. 115 feet up, as if floating in the air, it is a striking addition to a new community breathing life back into a neglected stretch of the Thames. Embassy Gardens' residential and commercial buildings also provide a backdrop to the new US Embassy which was relocated from Grosvenor Square in 2018. Embassy Gardens' residential offer is centred around a collection of onsite indoor and outdoor amenities, courtyard gardens, cinemas, gyms, business centres, a new linear park and the Skypool. The 82 feet long pool was initially envisaged as a swimmable bridge, creating a framed entrance into the courtyard of the central Embassy Gardens building from the US Embassy side, and a landmark to signal the entrance. 

Transparency was a key requirement. Initial designs took the form of a steel and glass hybrid, but the thickness of glass coupled with the required connections, meant this wasn't the optimum solution. The use of acrylic for submersibles and aquaria, and its response to multiple load pressures, is well understood. The weight of the water, coupled with the fact that the two buildings move as they settle provided significant challenges.

The design team was keen to explore whether acrylic could meet these challenges and perform as a bridge between two buildings whilst retaining transparency, something which had not been done before. The design evolved as a pair of stainless steel ‘tubs’ or ends which are embedded in each building. 

The ‘tubs’ house the filtration and lighting systems and are mounted on adjustable jacks which maintain the level of the pool. The ‘tubs’ are linked by an acrylic U section measuring nearly 50 feet in length. A pair of stainless steel cables sit beneath the pool to pull each tub towards each other, and to hold the acrylic section in place. The acrylic U section is the result of collaboration between a British engineering team and an American specialist in polymer fabrication. 

A series of acrylic panels were cast and then bonded to form the U section to extremely tight tolerances. Joint lines were then polished out to create a single object. The stainless steel tubs were fabricated in North Carolina and sea freighted to the UK and installed by crane to await the delivery of the acrylic section. Fabricated in Grand Junction, Colorado the acrylic pool was shipped by oversize truck to Galveston, Texas, transferred to a ferry and eventually arriving by barge on the River Thames. The acrylic was then craned into position, rods tensioned and joints sealed before being filled with water. The first swimmers took to the water in the summer of 2021, enjoying views across to the US Embassy, the River Thames and onto Central London.