International Architecture Awards Tell a friend
Architects: Sweeny&Co Architects Inc.
Client: Allied Properties REIT
Contractor: EllisDon
Within the vibrant and historical King West area of Toronto, Allied Properties REIT has assembled multiple parcels containing heritage- designated buildings, to create a unique 273,500 sf building-over-building design. This bold move is accomplished by an innovative structural solution: 2 V-shaped steel masts are erected in the narrow lane between the two heritage buildings that extend up to and through the new building. From each mast, steel diagonals extend outwards, supporting secondary columns up and down, allowing it to suspend much like the structure of a suspension bridge. This allows the structural loading of the new office building to be carried down to the ground by the masts with absolutely no columns or structure penetrating the new or existing buildings.
Each V-mast carries 125,000 KN or 12,750,000 kg, equivalent to 850 public transit buses. On the west side of the property, a new podium building, clad in a sinuous terracotta, reflects the scale and character of the existing loft buildings. This additional element offers street-fronting retail space, the building lobby and lounge, as well as the elevator and stair core, which serves the office hovering above.
Spanning over the small city lots, the new office space is designed with floor plates exceeding 20,000 sf. Several large outdoor terraces and rooftop amenity spaces will cater to the technology and creative industry tenants that gravitate to this neighbourhood. While respecting the heritage character of the neighbourhood, this project makes a strong statement with striking architecture and an innovative structure, reflecting the contrast and the harmony of the old and the new, setting it to become a new landmark.
The existing heavy timber heritage building at 379 Adelaide Street West was completely renovated to meet current office requirements, including barrier-free access, new washrooms, and a complete upgrade of electrical and mechanical services.
Bridges were created from the new elevator core in the podium and cross over the 5-storey atrium to connect to the existing heritage building floorplates and offer increased leasable space for tenants.
The heavy pedestrian traffic invited opportunity to re-establish and reactivate the network of through-block connections/laneways at the ground floor plane between the existing and new buildings. This was accomplished by removing obstructions to eliminate dead-ends, lowering the raised ground floor to match grade for additional street-level retail, and unifying the landscape treatment including bringing the design into the main lobby. The destination urban lounge and atrium can be accessed from any direction and provide an opportunity for tenant and community connection.