International Architecture Awards Tell a friend

International Architecture Awards ARCHIVE 2021
SMU Connexion | Singapore, Republic of Singapore | 2020
  • SMU Connexion | Singapore, Republic of Singapore | 2020
  • SMU Connexion | Singapore, Republic of Singapore | 2020
  • SMU Connexion | Singapore, Republic of Singapore | 2020
BACK TO ARCHIVE
SMU Connexion | Singapore, Republic of Singapore | 2020

Architects: MKPL Architects Pte Ltd.
Client: Singapore Management University
Contractor: Lian Ho Lee Construction (Pte) Ltd.
Landscape Architects: Sald (Pte) Ltd.
Photographers: Singapore Management University

SMU Connexion (SMU-C) is a vibrant and dynamic learning environment that reflects the ethos of collaboration and spirit of innovation of Singapore Management University (SMU).

The project site is located in the heart of the cultural Civic District in the city of Singapore, close to Fort Canning Park and the National Museum. SMU-C is a distinctive landmark with a strong civic presence, sensitively woven into the city fabric to reinforce SMU’s character as a city campus. Strategically located in the heart of the existing SMU campus, SMU-C functions as a Campus Connector, seamlessly integrating the existing School of Accountancy and School of Law through strong physical connections.

A 2-storey link building spans across the Fort Canning Link, serving as a vital physical connector between SMU-C and the School of Law, ensuring connectivity across the campus.

The Institute of Innovation and Entrepreneurship (IIE) incubator is strategically located within this link building, reflecting SMU’s focus on innovation and entrepreneurship and symbolizing SMU’s unique qualities as a city campus.

Brief Interpretation & Design Development

The design brief called for a central shared learning hub within the SMU campus, with extensive informal learning zones complementing formal learning spaces. It emphasised a few key design goals: To encourage experimentation, enable 24/7 learning, engage the city, and embrace new technologies. SMU-C is tied to SMU’s learning initiatives, which encourage interdisciplinary collaboration and innovation.

It is designed for flexible learning settings and spaces that support new learning methods. Maximum flexibility is achieved through open floor plates and minimal fixed walls, which allows for continuous test-bedding of new spatial configurations. Spaces are defined through the creative use of innovative furniture systems. This future-proofing of the facility ensures its longevity and reinforces the ethos of sustainability.

The design includes various unique urban spaces e.g. the North Plaza, South Plaza and the Campus Boulevard (and Solar Verandah) which enrich the overall urban quality around the campus, strengthening the relationship between the SMU campus and the city.

A common datum is established at the 3rd storey, which enables seamless connectivity from School of Accountancy through SMU-C to School of Law. The key facilities such as Active Classrooms and Seminar Rooms are located at this common level, to facilitate shared use of common resources and encourage inter-disciplinary interaction and collaboration.

The Boulevard Link also serves as a viewing gallery, enabling participation and appreciation of activities along the Campus Boulevard under the shelter of the Solar Verandah.

A Progressive Approach to Architecture and Design

The design of SMU-C aims to challenge educational boundaries by providing a variety of learning spaces for different learning styles. The Integrated Learning Studios is a unique space, which enables 24/7 learning: pull-down beds and informal meeting spaces allow students to work in groups and teams as part of their learning programs.

Collaboration spaces strategically located on level 3 and 4 are designed to have different sitting configurations and settings to suit a variety of uses, providing opportunities for chance encounters and exchange to build community and strengthen the spirit of collegiality and collaboration.

SMU-C spearheads some new building initiatives which innovatively tackle energy challenges. It is the first Mass Engineered Timber (MET) building in the city, supporting the authorities’ drive towards higher productivity and more sustainable buildings. It is a prominent showcase project for MET construction technology and contributes to overall construction productivity and efficiency. SMU-C is also designed as a net-zero energy building.

Besides optimising natural ventilation and harnessing solar energy, it is also a pilot testbed project for enhanced Passive Displacement Cooling (PDC) in an institutional building, a cooling system that greatly reduces energy footprint compared to conventional air-conditioning, which also fully integrates all mechanical and electrical systems into one unit. The major design benefit is the ability to more clearly express the timber structure. SMU-C incorporates purposeful use of technology in achieving a Smart Building and creates a biophilic learning environment and workplace that is focused on the health and wellness of its occupants

The building has achieved the Singapore Building and Construction Authority’s GreenMark Platinum Certification as well as the WELL Building Standard. Highlights SMU-C is unique in a few key areas: its function as a campus connector on a prominent site and setting, its embracing of new environmental sustainability initiatives, and its use of innovative building materials and methods, all of which were achieved despite various constraints imposed on the project.

Firstly, the site is odd-shaped, with a building height limit of 24m above-average mean sea level. Functional requirements for SMU were nevertheless met within the tight site. The small building footprint and limited roof space also meant it was a challenge to mount sufficient solar panels to achieve a net-zero energy building. This was overcome by strategically extending the roof canopy over the Stamford Canal as a “solar verandah”, providing additional roof space for solar panels whilst creating an all-weather pedestrian boulevard and events space below.

Given the close proximity of SMU-C to various existing critical infrastructure such as the Fort Canning tunnel and underground Stamford Canal, construction planning had to be carefully thought through. The construction of a three-story high link bridge-building to the School of Law over a busy 3 lane road also posed an engineering challenge that required careful planning to achieve erection within 7 days. As such, the project involved close collaboration with various key government agencies to find solutions to these challenges.

SMU-C is an ambitious project that aspires to a variety of unique design, sustainability, and educational goals, which meant many constraints had to be overcome. These challenges were met through innovative solutions, making SMU-C a stand-out educational facility.

NEXT/PREVIOUS
METROPOLITAN ARTS PRESS