International Architecture Awards Tell a friend
Moscow, Russia | 2017
Architects: SPEECH
Client: Moskomarkhitektura - Committee for Architecture and Urban Planning of Moscow
General Contractor: Mosinzhproekt
Photographers: Ilya Ivanov
The construction project was curated by Yekaterina Furtseva, First Secretary of the Moscow City Committee of the Communist Party of the Soviet Union.
The opening ceremony for the stadium was held on July 31st 1956.
In 1980 the stadium was the main arena for the Olympic Games.
Since 2013 Luzhniki has been closed for reconstruction.
In 2018 was the venue for a number of matches in the World Cup, including the final.
The renovated Luzhniki Large Sports Arena will have a maximum capacity of 81 000, which is 3000 more than its previous capacity.
Prior to reconstruction, up to 10% of the stadium’s seats were in positions with restricted views.
This was the reason why the stands themselves were replaced: now they are arranged in two tiers raked at a larger angle, and there is an additional tier containing 100 sky boxes.
These changes mean that football fans will have a fine view of the field from any point on the stands (including the bottom and top rows).
Also new here are comfortable VIP boxes for 1950 people.
The stadium’s external look has been carefully preserved – including the colonnade which girdles it, the internal wall, and the shape of the roof.
The only new element on the facade is the frieze in the form of a wide metal strip on which symbols of various types of sports have been placed using perforation.
The graphic design of this element was devised in collaboration with the Studio of ArtemyLebedev. The stadium will have a viewing platform at a height of 23 metres.
The platform will be situated at the highest level on the stands; people will be able to go up there freely to admire views of Sparrow Hills, the university, and the city centre.