International Architecture Awards Tell a friend

International Architecture Awards ARCHIVE 2018 International Architecture Awards
SANTRALISTANBUL TRANSFORMATION OF THE BOILER HOUSES TO ARCHITECTURE FACULTY
  • SANTRALISTANBUL TRANSFORMATION OF THE BOILER HOUSES TO ARCHITECTURE FACULTY
  • SANTRALISTANBUL TRANSFORMATION OF THE BOILER HOUSES TO ARCHITECTURE FACULTY
  • SANTRALISTANBUL TRANSFORMATION OF THE BOILER HOUSES TO ARCHITECTURE FACULTY
BACK TO ARCHIVE
SANTRALISTANBUL TRANSFORMATION OF THE BOILER HOUSES TO ARCHITECTURE FACULTY

Istanbul, Turkey | 2014

Architects: Nevzat Sayin Mimarlik Hizmetleri
Client: Istanbul Bilgi University
General Contractor: Erkay İnşaat
Photographers: Sami Metin Uludoğan

Located on İstanbul Bilgi University’s Santral Campus today, boiler houses number 4 and 6 were built in 1914.

There is a protection order to preserve the Silahtarağa Power Station -put out of operation and abandoned in 1983- along with other buildings of the period as industrial heritage.

Since İstanbul Bilgi University obtained the rights to long-term use of this area in 2004, we have done many projects as NSMH to preserve these buildings and assign new functions to them.

However, due to the prioritized construction of other buildings on campus, nothing was done on the two boiler houses until 2013 except approved dismantling and reinforcement works.

Following the disassembly, boiler houses 4 and 6 both have intact old boilers with protection orders.

After a special process, these boilers were preserved in situ in their original form.

Keeping in mind that the boilers were the true owners of this building, we considered their contribution to the space quite important.

The workshops, exhibition, and jury areas of the School of Architecture were treated in a way to support the spatial principles in the building.

Although we faced some challenges when the university increased the number of students to be admitted by fifty percent, the studios at five different levels were visually connected to maintain the initially-desired transparency.

Undergraduate studios, model workshops, and exhibition areas were placed in boiler house 4, whereas a large portion of the library and jury area, graduate school studios, common studios, and faculty rooms assumed their places in boiler house 6.

Built structurally as a thin envelope to protect the boilers, the existing shell was reconceived to provide the necessary building physics conditions as the buildings were assigned a new function.

A wall-joinery system was introduced to comply with the floors and façade spans behind the existing outer façade and to provide the new standards of comfort.

Embellished with the gallery voids supporting the open space structure within the possibilities of the steel structure applied in line with the reinforcement of 2006, the interior spaces helped capture the spirit of the existing building.

The two buildings are connected to one another through the common spaces on the ground floor. However, as the next step, an ‘intermediate structure’ was designed to connect the buildings at more points and serve as the conference hall and passageway. 

This next step has not yet been built.

Today, the building struggles with the over capacity of the students without the intermediate structure. In the end, the process of transforming boiler houses 4 and 6 was completed with an architectural concept that respects the buildings of the past but also makes its own presence known.