International Architecture Awards Tell a friend
San Francisco, California, USA | 2015
Architects: HOK + Mark Cavagnero Associates
Client: Department of Public Works Bureau of Project Management, City and County of San Francisco
Contractor: Charles Pankow Builders
Photographers: Tim Griffith
Located in the city’s burgeoning Mission Bay redevelopment district, the 285,000-square-foot San Francisco Public Safety Campus represents a significant investment in a prominent public safety facility. State-of-the-art engineering and a landmark scale unite in a highly resilient structure that consolidates critical municipal services—which include three entities—the city’s police headquarters, a relocated district police station, and the Mission Bay fire station—under one roof.
The complex, which incorporates the historic Fire Station No. 30, renovated for contemporary community uses, ensures the city’s uninterrupted access to essential services and establish an important civic presence in one of the city’s critical redevelopment areas. A civic place.
Located along the busy Third Street corridor between Mission Rock and China Basin Streets, the building is designed to blend into the neighborhood’s future development, while establishing a distinct presence befitting a significant civic landmark.
The site master plan unifies the new building, composed of two off-set, six-story-high wings, and the two-story brick fire house into a civic complex that signals site’s heritage and the neighborhood’s ascendant place in the city, and anticipates future mixed-use development on the surrounding blocks.
A gracious entry plaza and south courtyard, both of which connect with wide, landscaped sidewalks encircling the site, allow the fire house to maintain its unique identity while playing an important role in the site overall.
Through a public art program sponsored by the SF Arts Commission, new works commissioned for the project complete the civic composition. Responsive design. The design thoughtfully engages the site’s physical conditions to align user needs and efficient environmental performance, targeted to achieve LEED NC Gold.
A concrete plinth establishes a secure base for the towers, which are enclosed with a variegated, high-performance glass curtain wall. The two 63-foot-long bars connect by a transparent east-west oriented core to form an offset H-configuration that tempers the tower’s perceived massing from the street, and facilitates the penetration of daylight, views and ventilation into the building’s interior.
Particular attention was given to the design of the west facade, balancing its prominence on the major thoroughfare and its intense exposure to direct sunlight.
A delicate louvered metal scrim, floating apart from the structure, wraps the towers from north to south, minimizing unwanted glare and heat gain and providing a generous overhang to the west.
The project integrates the Police Headquarters and district police station into a single facility with shared entries and infrastructure to maximize efficiency.
The three entities, the city’s police headquarters, district police station and the Mission Bay fire station, are efficiently organized in interlocking blocks within the plinth to establish distinct identities for each.
The district police station and public functions of the police headquarters are accessed through separate entries off of the main plaza, while the new fire station faces Mission Rock Street and fleet parking entries sit at the site’s rear corners.
The police headquarters offices occupy the towers and are accessed by elevators at the core.
Within the towers, interior circulation along the west perimeter buffers open plan workspace from direct sun, while enclosed office and conferences face eastward. Air- and water-side economizers take advantage of San Francisco’s mild climate and minimize electric chiller run time.
Other sustainable elements include green roofs, rainwater harvesting for irrigation and plumbing, low-flow plumbing fixtures, solar hot water heating, an active chilled-beam cooling system, and healthy building materials.
Finally, the Public Safety Campus illustrates an efficient design process that is accountable to diverse constituents. From the outset, an ethic of integrated project delivery, aided by building information modeling (BIM), facilitated a highly collaborative design process. Seamless access to shared information among consultants established a streamlined, well-coordinated decision-making process.