Green Good Design Awards Tell a friend
Location: Brooklyn, New York, USA
Architects: Schiller Projects
Architect of Record: Acheson Doyle Partners Architects
Design Lead: Aaron Schiller
Architectural Design Team: Colin Cleland and Alberto Rodriguez
Landscape Architect: Brook Landscaping
Client: Private
Photographers: Frank Frances
The Mass Timber House presents an ideal case study in expanding the agency of the architect to ensure a truly sustainable, on-budget project and process. By involving the architect at the earliest stages of design and construction, we pioneered a near-zero carbon approach through mass timber methods.
The renovated home is defined not only by biogenic materials but also by biophilic design interventions that create an idyllic, light-filled setting. From the introduction of a large skylight to a signature open staircase and a seven-foot-tall interior maple tree that becomes the home’s centerpiece, the project demonstrates that design excellence and low-carbon construction are not mutually exclusive.
Traditionally, in architecture, the design process precedes material sourcing, often leading to increased costs, compromises to aesthetic vision, and reduced environmental benefits. For the Mass Timber House, we inverted this standard approach by sourcing materials first and using their specific dimensions and properties to inform the design.
The team conducted an exhaustive search for sustainable timber across the East Coast and identified a university dormitory project in New England requiring over 150,000 square feet of timber. By engaging directly with the supplier, we secured 7,000 square feet of identical material at the same price negotiated by the university.
We also eliminated additional transport costs by coordinating direct pickup outside the university gates. This strategic decision was pivotal in making the project both cost-effective and environmentally responsible, significantly reducing the carbon footprint associated with transportation and production.
With the timber secured, we sculpted the design around the exact quantity and characteristics of the material procured. This reversal of the traditional process—engineering the structure around available resources—allowed us to optimize material use, reduce waste, and embrace a more precise, artisanal design methodology.
As a construction technology, mass timber replaces carbon-intensive materials such as steel and concrete with lighter, long-span, fire-resistant glue-laminated timber floors. The reduced weight enables faster transport and more efficient on-site assembly, resulting in a cost-effective building system with a comparatively small carbon footprint.
The life cycle of the construction materials was also a key consideration. Unlike conventional systems, mass timber supports the repurposing of materials across multiple building lifetimes. We approached the project with long-term adaptability in mind, ensuring that if zoning laws in this part of Brooklyn were to change in the future, the materials used could be disassembled and reused rather than discarded. This forward-looking strategy reinforces the project’s commitment to sustainability and resilience.
Sustainability was further embedded through the reuse of timber from the original building. Historical beams dating from the 1860s and 1880s were refurbished locally and repurposed as flooring, preserving the site’s architectural heritage while minimizing the need for new materials.
The Mass Timber House sets a compelling precedent for how innovative sourcing, material reuse, and early architectural involvement can elevate both the ecological and aesthetic value of residential architecture, redefining what responsible design can achieve.