Green Good Design Awards Tell a friend

Green Good Design Awards ARCHIVE 2025 Green Architecture
Gunnison-Crested Butte Regional Airport | 2024
  • Gunnison-Crested Butte Regional Airport | 2024
  • Gunnison-Crested Butte Regional Airport | 2024
  • Gunnison-Crested Butte Regional Airport | 2024
BACK TO ARCHIVE
Gunnison-Crested Butte Regional Airport | 2024

Gunnison County, Colorado, USA

Architects: Gensler
Design Team: Brent Mather, Casey Johnson, Sarah Buscarello, and Becca Faull
Client: County of Gunnison
Photographers: Ryan Gobuty

Located in central Colorado, Gunnison is often referred to as “one of the coldest places in the United States.” This moniker weighed heavy on the early establishment of priorities for the terminal renovation and expansion project. While the previously prepared project program focused on capacity and expansion, the ultimate design solution was rooted in efficiency and re-use. With limited resources, this approach allowed for the programmatic needs to be met while still being able to address a building envelope in need of substantial improvements. The end result will be a completely modernized (and slightly expanded) 40,000 sf, 4-gate terminal with a drastically improved passenger experience, enhanced operational efficiency and safety, served by a highly-efficient geothermal well field and energy recovery ventilation (ERV) mechanical system, devoid of all natural gas.

This commitment by Gunnison County to an all-electric/geothermal solution is poised to pay off immediately. During design additional funding was provided by the Federal CARES Act allowing for a future site development project to be realized immediately, inclusive of a photo-voltaic system integrated into new covered parking. The overall site design includes other more passive landscape strategies, such as xeriscaping, bioswales for water and snow detention, and more pedestrian friendly pathways. A primary goal for the project, from the beginning, has been to transform the terminal into a net-zero facility and it came to be by simply prioritizing what matters most.

DESIGN FOR ENERGY
Net zero energy was the goal from the onset of the design of the Gunnison Crested Butte Regional Airport. Gunnison County, the airport owner, is a sustainability minded government entity with a history of building energy efficient projects. Strong advocates for net zero, the County empowered the design team to explore a spectrum of solutions.

One of the workhorse renewable energy generators is the geothermal well field which includes thirty two 400′ deep vertical wells. A 847kw solar array, providing energy used on site, is another primary energy source and doubles as covered parking for travelers. An Energy Recovery Ventilation (ERV) system further strengthens the energy efficiency and the air quality within the terminal.

In response to the extreme climate, upgrading the performance of the envelope was critical to thermal comfort and energy reduction. An R-36 continuous insulation roof assembly and wall R-20.3 + R-10 continuous insulation wall assembly significantly improved the enclosure performance. Additionally, both double and triple glazed insulated windows were installed to address heat loss and the extreme temperature differentials throughout the year.

With the full replacement of MEP systems, the design consciously includes equipment that achieves an all electric solution. The Gunnison Crested Butte Regional Airport leveraged a holistic approach to energy efficiency resulting in a net zero facility that serves as a model of sustainability in the community.

NEXT/PREVIOUS
METROPOLITAN ARTS PRESS