The European Prize for Architecture Awards Tell a friend
Credits: Manuelle Gautrand Architecture
Client: Gecina
Surface: 6.000 m²
Photographer: Vincent Fillon
Project Description
The Origami Office Building stands on avenue Friedland, in a luxurious Parisian neighborhood.
The location of the site led to design a project that would embrace the view and immerse into the natural light. An emblematic showcase of the building – the main façade is mostly glass, partially covered with a second-skin of screen-printed marble pattern. The effect is a tremendous origami and the view of this delicate folded marble can be enjoyed both from exterior and interior of the building.
The panels are composite, a film of marble mounted on a double layer of glass. The second skin is translucent and acts as a breast wall to ensure privacy as well as filter daylight, creating a soft interior atmosphere. Marble folds create a vibration along the 30 meter-long façade. At both ends, in continuity with the façades of neighboring buildings, the origami becomes calmer and flattens out. But in the central part it forms a delicate bas-relief.
A screen-printed marble pattern was chosen as it offers numerous advantages over a "real" marble. The color and the design may be perfectly controlled, especially in comparison with neighboring buildings whose stone colors have been modified or renovated. The precise position of the veins of the marble was achieved through a perfectly cut framework layouts to create an “open book” folds that remind a historical tradition of marble stone-works. Different types of graphics and colors of marble were created and three types of marble screen-print were used. The first, the most “heavy” in the center features two veins with the dominating beige color; whereas the other two are gradually spread towards the extremities of the façade, they are lighter and less veined. The objective was to seek the precise colors of the adjacent beautiful Haussmann buildings.
The project is certified “HQE” - the French High Environmental Quality standard for office buildings.
The project was completed in March 2011.