Europe 40 Under 40 Awards Tell a friend

Europe 40 Under 40 Awards ARCHIVE 2026
Butterfly Footbridge | Angers, Pays de la Loire, France | 2025
  • Butterfly Footbridge | Angers, Pays de la Loire, France | 2025
  • Butterfly Footbridge | Angers, Pays de la Loire, France | 2025
  • Butterfly Footbridge | Angers, Pays de la Loire, France | 2025
BACK TO ARCHIVE
Butterfly Footbridge | Angers, Pays de la Loire, France | 2025

Category: Bridges and Infrastructure
Architect:
Grégoire Arthuis, France
Architecture Office: Nu Architecture Ingénirie
Lead Architect: Grégoire Arthuis
Design Team: Grégoire Arthuis, Thibaut Dubégny
Contractor: Simonin, NGE GC
Client: Alter Cités (City of Angers)
Photographer: Nu Architecture & Ingénierie 

The project examines the Monplaisir urban renewal program, where a mobility study identified the need for a new pedestrian connection across the Paris–Angers railway corridor, an infrastructural scar that had divided the district for more than a century. The footbridge was conceived not as a technical object but as an urban gesture capable of reuniting two landscapes and restoring continuity for pedestrians and cyclists, including those with reduced mobility.

The site carries a distinctive heritage. More than 150 years ago, the railway cut through the estate of the Manoir de la Gagnerie, separating an arboretum of rare species to the west from a forest of oaks and lime trees to the east. This duality of planted worlds—both shaped by Joseph Hébert de la Rousselière, physician and horticulture visionary—became the project’s narrative foundation. The footbridge had to reconnect what history had split, without imposing itself on the delicate ecology of the park.

The resulting design is a restrained and landscape-driven intervention. Its “butterfly” geometry narrows at mid-span and opens generously at its landings, framing two contrasting scenes: the forest edge on one side, a cluster of stone pines on the other. The structure avoids the sensation of a corridor and instead creates a quiet space, an elevated promenade aligned with the new East–West axis of the district. Through its clarity and minimalism, it dialogues with the organic complexity of the park while remaining intentionally understated.

Delivered under a unified design–build supervision by agency Nu for Alter Public, the project integrates the stringent constraints of a live railway environment. From the earliest sketches, the team anticipated SNCF regulatory demands—electrical safety clearances, 2-meter protective screens—and committed to a precise installation window booked in 2022 to avoid interrupting national rail traffic.

The ecological sensitivity of the site dictated the construction strategy. The fragility of the trees and the narrow access routes required full prefabrication in the Simonin workshops in the Jura mountains. Every element—structure, cladding, and decking—is made of wood, significantly reducing the project’s carbon footprint. Two glued-laminated Douglas fir truss beams, spanning 33 meters, form the structural backbone. Their inclined alignment provides natural electrical protection while ensuring a single uninterrupted leap over the Paris–Nantes railway lines.

The exterior is clad in blackened oak, anchoring the bridge visually in its context: the deep green of the arboretum, the dark schist that defines the local architectural identity. Installed in a single night by a mobile crane lifting its 40-ton prefabricated body, the bridge exemplifies an approach where engineering precision and environmental respect reinforce one another.

More than a crossing, the project reinstates continuity—between two parks, two landscapes, two fragments of a neighborhood. It demonstrates how infrastructure, when handled with restraint and vision, can act as a cultural and ecological catalyst within the contemporary city.‍

NEXT/PREVIOUS
METROPOLITAN ARTS PRESS