Europe 40 Under 40 Awards Tell a friend
Category: Schools and Universities
Architect: Alienor Bolelli, France
Architecture Office: Minuit Architectes
Lead Architect: Minuit Architectes
Design Team: Alienor Bolelli, Félix Borel, Maxime Eon, Joseph Vincent
Contractor: Groebli, Prunevieille, Ouaret Batiment
Client: ENSA-Versailles
Photographer: Severin Malaud
The project examines the National School of Architecture of Versailles, located facing the Château de Versailles in the former King’s Stables, and accommodating more than 1,200 students each year. Due to changes in teaching methods and the deteriorating condition of the premises, the administration decided to carry out a complete renovation of part of the school: its workshops. The site, partially occupied and heritage-listed, required a rapid intervention, which led the design process toward a synthetic approach.
To address the various challenges, the project reorganized all the building services, incorporating lighting and furniture, both fixed and mobile. This was accompanied by a clean and simple renovation of the historic shell. The project covers an area of 1,500 m², composed of three large workshops with distinct geometries.
The renovation takes advantage of each space’s specific features to offer a variety of work and learning environments (group work, individual work, computer use, model making, etc.), while also encouraging interaction between students. Two of the spaces, due to their unique configurations, are more suited to solitary work or model making, while the third workshop, with its simple layout, allows for a wide range of configurations thanks to its mobile tables and suspended services (exhibitions, presentations, etc.).
The custom-designed furniture is mechanically assembled from standardized elements, modified as little as possible. The attachment systems to the existing structures were designed to efficiently free up and clear the spaces, which are often cluttered during project submissions. Raw materials, such as galvanized steel and recycled plastic, are used to resonate with the history of the site. The restoration of the stone and plaster, over 300 years old, creates a dialogue between the historic architecture and the new intervention.